Algeria, Nigeria, and Niger sign MoU for $13 billion Trans Saharan gas pipeline

The more than 4,000km (2,485 mile) long onshore gas pipeline is planned to start in Warri in Nigeria, travel through Niger, and end in Hassi R’Mel in Algeria, from where it will connect to existing pipelines that reach Europe.